Energetyka
|CS.118
Preparing a SCADA System for IEC 62443 Certification
Supporting a SCADA manufacturer in preparing for IEC 62443 certification - development processes (4-1) and component requirements (4-2).
Client
SCADA system manufacturer
Challenge
The need to simultaneously meet requirements of two standards: IEC 62443-4-1 (secure development processes) and IEC 62443-4-2 (component requirements), which required changes in both the product development lifecycle (SDL) and the product itself.
Approach
Gap analysis and product review
Gap analysis against both standards and product review in the areas of authentication, authorization, integrity, and confidentiality.
Certification strategy and SDL implementation
Development of a certification strategy, support in implementing secure development lifecycle (SDL) processes, and a trial audit to verify readiness.
Results
Certification roadmap for both standards
Identified gaps for IEC 62443-4-1 and 4-2
Implemented secure development lifecycle (SDL)
Confirmed certification readiness through trial audit
Related case studies
CS.114
Physical Security Audit of a Transmission Operator's OT
Physical security assessment of transmission facilities in the context of hybrid threats - at the intersection of physical security and ICS/SCADA systems.
CS.113
Comprehensive OT Technology Network Security Audit
Multi-phase TAN audit of an energy operator - from IT/OT segmentation testing to physical access attempts and retesting within 90 days.
CS.117
OT Security of Renewable Energy Farms
OT security assessment of distributed wind and photovoltaic farm infrastructure.
We'll discuss scope, methodology, and timeline.
Free consultation, no strings attached.